PROJECTS
Middlesex University - Learning Resource Centre (Hendon Campus)
Client: Middlesex University
Main Contractor: Fitzpatrick Contractors Ltd.
The project comprises the construction of complete new build of the learning resource centre. This was the Design and Build Project of the new 3 storey X shaped steel frame building.
Middlesex University - Learning Resource Centre (Hendon Campus)
Client: Middlesex University
Main Contractor: Fitzpatrick Contractors Ltd.
The project comprises the construction of complete new build of the learning resource centre. This was the Design and Build Project of the new 3 storey X shaped steel frame building. The construction consisted of CFA piling, RC pile caps and ground beams and ground bearing reinforced concrete slab. Also Drainage (New Drainage, Upgrading Existing Drain, and Rainy water harvesting system and Petrol tank), curtain walling, Sto Render system, Glass glazing, double T pre-cast concrete planks and butterfly roof design.
The external works comprised of the construction of new access road, car parks, RC retaining walls, hard landscaped paved areas and landscape across the perimeter of the building.
The green credential comprises the rainy water harvesting system, which store rainy water and then distribute the stored rainy water into the building for use in the toilets system replacing metered water. The rainwater is distributed via standard control system which features a high specification pump and level control installed within the harvest tank. Also the building was designed and orientated to make best use of the sun’s track over the sky.
The building was conceived as a series of steel column and beams set at 9000mm centres, set on top of reinforced concrete pad foundation on a cfa piles, floors were double T pre cast concrete planks topped up with self levelling concrete topping. Internal partitions were made out of Metsec system, and some core areas were high strength blockwork. The resulting building frame was then curtained walled, glass glazed, and sto rendered to achieve its crisp image.
The construction consisted of CFA piling, RC pile caps and ground beams and ground bearing reinforced concrete slab. Also Drainage (New Drainage, Upgrading Existing Drain, and Rainy water harvesting system and Petrol tank), curtain walling, Sto Render system, Glass glazing, double T pre-cast concrete planks and butterfly roof design.
The external works comprised of the construction of new access road, car parks, RC retaining walls, hard landscaped paved areas and landscape across the perimeter of the building.
The green credential comprises the rainy water harvesting system, which store rainy water and then…
Middlesex University - The Quadrangle (Hendon Campus)
Client: Middlesex University
Main Contractor: Fitzpatrick Contractors Ltd.
The project comprises of enabling works, refurbishment and the construction of new glass enclosure to the Quadrangle. The works consist of Drainage (new and existing diversion), CFA piling, pile caps and Round ground Beams, Steel Frame, RC Concrete slab. Also the construction of new water feature and external works involve paving and landscape.
The project comprises of enabling works, refurbishment and the construction of new glass enclosure to the Quadrangle. The works consist of Drainage (new and existing diversion), CFA piling, pile caps and Round ground Beams, Steel Frame, RC Concrete slab. Also the construction of new water feature and external works involve paving and landscape.
Leeds Aquatic Centre - Olympic Size Swimming & Diving Pool
Client: Leeds City Council
Main Contractor: Sir Robert McAlpine
Financed by Leeds City Council and a £5m capped grant from Sport England. The Swimming & Diving Pool, constructed by Sir Robert McAlpine on the South Leeds Stadium site, this is one of the largest Olympic sized swimming Pools in the North of England. 50 metres long and 10 lanes wide it will offer regional and local sports facilities in the Leeds Area
Leeds Aquatic Centre - Olympic Size Swimming & Diving Pool
Client: Leeds City Council
Main Contractor: Sir Robert McAlpine
Financed by Leeds City Council and a £5m capped grant from Sport England. The Swimming & Diving Pool, constructed by Sir Robert McAlpine on the South Leeds Stadium site, this is one of the largest Olympic sized swimming Pools in the North of England. 50 metres long and 10 lanes wide it will offer regional and local sports facilities in the Leeds Area
The project was the construction of 50m Olympic spec swimming and diving pool. The construction consist of Earthworks, piling foundation, pile cap, ground beams, RC diving Pool substructure works, Steel frame building with 2500 spectators seats with Metsec structural curtain walling and external works including Highway improvement section 278 works and construction of the new round about.
The diving pool incorporates the only purpose built synchronized diving tower in the UK allowing training to Olympic standards at all platform heights. The floating floor allows community use when not being used for diving. There is a specialist dry land training area with harness; foam pits trampolines and other fitness equipment to provide training facilities for both diving and swimming.
The construction of two submersible booms built into the main pool enable it to be divided into three pools of different sizes and depths, allowing a flexible daily swimming programme.
A floating floor allows the depth of the diving pool and one third of the main pool to be varied from two metres to shallow water for teaching and 0-5 meters for the diving pool. The centre also includes an aerobics studio and multi-use rooms.
The project was the construction of 50m Olympic spec swimming and diving pool. The construction consist of Earthworks, piling foundation, pile cap, ground beams, RC diving Pool substructure works, Steel frame building with 2500 spectators seats with Metsec structural curtain walling and external works including Highway improvement section 278 works and construction of the new round about.
The diving pool incorporates the only purpose built…
Demonfort University - Centre Of Excellence & Performing Art
Client: Demonfort University
Main Contractor: Interserve Project Services Ltd
This is the design and build project of 3 storey steel framed building with a mezzanine floor, curtain walling and terracotta cladding.
The construction consists of reduce level ground, cfa Pilling, Pecafil pile caps and ground beams and new drainage installation. External works package includes hard and soft landscape and car parking area.
This is the design and build project of 3 storey steel framed building with a mezzanine floor, curtain walling and terracotta cladding.
The construction consists of reduce level ground, cfa Pilling, Pecafil pile caps and ground beams and new drainage installation. External works package includes hard and soft landscape and car parking area.
The Two Orchards - Bracknell
Client: Terrace Hill
Main Contractor: Miller Construction Ltd.
The project consists of a construction of four, 4 storey’s high phased RC frame buildings with, basement RC car park. The construction involved Bulk excavation, driven precast pilling, RC and mass concrete foundations, Drainage, RC & Gabion retaining walls, kingpost walls, the buildings designed to have flat slab construction.
External works package including sports pitches and section 278 highway works.
The project consists of a construction of four, 4 storey’s high phased RC frame buildings with, basement RC car park. The construction involved Bulk excavation, driven precast pilling, RC and mass concrete foundations, Drainage, RC & Gabion retaining walls, kingpost walls, the buildings designed to have flat slab construction.
External works package including sports pitches and section 278 highway works.